Print this page

3 Bedrooms and + Apartment for rent in La Clusaz

Apartment
-
Reference PL1001

Flat ** 103 sqm for 10 pers.
– Entrance hall with cupboard (4.61 sqm)
– Living room with french window and a 100 sqm terrace South facing, sofa-bed 140 cm x 2 pers., fire place (23.60 sqm)
– Kitchen (hob 4 zones, cooker hood, refrigerator/freezer (302 L), oven, microwave, dishwasher, washing machine) with window ouest facing (17.67 sqm)
– Bedroom area 2 bunk beds 70 cm x 1 pers. (upper bed forbidden under 6 years old) (6.50 sqm)
– Room with 1 bed 160 cm x 2 pers. with south facing window (13.51 sqm) and shower room (shower, sink and W.C.) (2.85 m²)
– Room with 2 bunk beds 80 cm x 1 pers. (upper bed forbidden under 6 years old) with south facing window (8.63 sqm)
– Room with 2 beds 80 cm x 1 pers. and south facing window (13.32 sqm)
– Bathroom (bath, sink) and toilet (6.71 sqm)

Level : ground floor
2 private garages n° 13 and 14 (L 4,75m x W 2,37m x H 2,40m) each one
Ski locker / No wifi (wifi router rental possible)
Pet allowed on request / Non-smoking flat
BED LINEN AND PILLOWCASES ARE PROVIDED except bathroom linen

Rating number : 07403 074 080 14 0202

IMPORTANT : Chairlift “Crêt du merle” CLOSED from the 26th of march 2017 and building of a new one from the 1st of april up to the 15th of december 2017.

Features

  • Dishwasher
  • Fireplace
  • Garage / Parking / Box
  • Ground floor
  • Lift
  • Mountains view
  • Near ski slopes
  • Near Swimming-pool
  • Pets allowed
  • South / South-East / South-Ouest facing
  • Washing machine
  • Wifi in the residence

This property is located in the «PLESSIS» apartments block

Residence “LE PLESSIS” with 10 accommodations located in the center of the resort.
The village appreciated for its shops and boutiques.
Close to the chairlift “Crêt du Merle” allowing access to all skiable massifs. At 200 m from the main rally of the ski school and skating rink.
At 550m from the bus station and 33 km from the Annecy train station.

IMPORTANT : Chairlift “Crêt du merle” CLOSED from the 26th of march 2017 and building of a new one from the 1st of april up to the 15th of december 2017.